Users Guide to Switching Baselines
07/29/03, bt
Switching to North-West Configuration
- Remove the S. Primary pipe next to the delay lines.
- Crank the stage holding the S. Primary fold mirror all the way back, out of the beam.
- Disconnect the S. Accelerometer BNC cable (located in the rack just below the sequencer CPU).
- Log in, cd to /home/pti/bin, type "NW".
- Power cycle the "Cardcage Power" for West, switch (off, wait 5 seconds, on).
- Do a FULL reboot, remember to hit the cardcage reset, and the camera reset as well.
Switching to North-South Configuration
- Crank the stage holding the S. Primary fold mirror in to the number shown on the stage (2800).
- Put in the S. Primary pipe next to the delay lines.
- Re-connect the S. Accelerometer BNC cable (located in the rack just below the sequencer CPU).
- Log in, cd to /home/pti/bin, type "NS".
- Power cycle the "Cardcage Power" for South, switch (off, wait 5 seconds, on).
- Do a FULL reboot, remember to hit the cardcage reset, and the camera reset as well.
Switching to South-West Configuration (from NS)